Glendale, AZ · Maricopa County · 33.539°N 112.186°W
Aligned PHX-13
Aligned Data Centers
Key facts
- Location
- Glendale, AZ, Maricopa County
- Capacity
- 72 MW planned
- Powered by
- —
- Announced
- —
- Last updated
Civic impact
Economics
- Land
- 100 acres
Energy & water
- Energy source
- Grid · Utility: Arizona Public Service (APS)
- Cooling
- Closed-loop
APS is building a new 230 kV transmission line to serve the campus (DCNN); grid-sourced renewables, no on-site generation.
Aligned Delta-cube closed-loop air-cooling arrays with water recycling (no evaporative draw); DeltaFlow liquid cooling planned for dense AI workloads. A marketed '>73% water reduction' is versus the site's prior agricultural (rose-farm) use, not a data-center withdrawal figure -> no MGD recorded.
Community sentiment
Glendale Mayor Jerry Weiers attended and praised the April 2025 groundbreaking; the City of Glendale issued its own release. No opposition, contested vote, or litigation documented.
Aligned Data Centers breaks ground - Glendale mayor praises PHX-13Status history
- Under construction
Aligned broke ground on PHX-13, a 72 MW campus in Glendale, expanding its Arizona footprint
Aligned Data Centers breaks ground on Glendale, expanding Arizona infrastructure
Location
Sources & data provenance
Confirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
- ConstructConnectRetrieved:
- DCNN MagazineRetrieved:
- Glendale StarRetrieved:
- Data Center DynamicsRetrieved:
Compute Atlas is community-correctable. If you have better data, please open an issue.
Suggest a correction →