Salem Township, PA · Luzerne County · 41.095°N 76.145°W

AWS Cumulus Data Center Campus, Salem Township

Amazon Web Services

Under constructionAI-specificConfirmed

Key facts

Location
Salem Township, PA, Luzerne County
Capacity
48 MW
Powered by
Nuclear (Susquehanna Steam Electric Station, Talen Energy PPA)
Announced
2021-07
Last updated

Civic impact

Economics

Investment
$650M
Land
1,200 acres

Energy & water

Energy source
Nuclear · Utility: Talen Energy
Cooling
Evaporative
Water use
0.06 MGD

10-year PPA from adjacent 2.5GW Susquehanna nuclear plant; 2025 expanded agreement for up to 1,920MW by 2032. AWS acquired Talen's Cumulus campus for $650M (acquisition price; full campus buildout cost separate).

0.060 MGD (30-day average) per Amazon's SRBC consumptive-use application, covering evaporative cooling for Buildings 2 and 3 of the initial phase (Building 1 has no consumptive use); water is drawn from an on-site production well, not the Susquehanna River directly. Full 960 MW build-out demand is not stated in the application.

Public subsidies

Community sentiment

Mixed

Local sentiment is divided per Salem Township officials. The township signed nondisclosure agreements with data-center developers, drawing transparency criticism from a state legislator, and there has been significant residential turnover near the site (homes bought out). No organized litigation specific to this campus was identified.

Big money, enforced silence play roles in Pennsylvania's data-center push

Status history

  1. Proposed

    Talen Energy announces Cumulus Data Center campus with AWS as anchor tenant adjacent to Susquehanna Steam Electric Station

    AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania
  2. Under construction

    First 48MW hyperscale building (300,000 sq ft) completed by Talen

    AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania
  3. Under construction

    AWS acquires full 960MW campus from Talen Energy for $650M; phased 120MW-increment buildout to continue through 960MW or optionally capped at 480MW

    AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →