Santa Clara, CA · Santa Clara County · 37.354°N 121.955°W

ECL CSC-1 FlexGrid AI Data Center

ECL

ProposedAI-specificReported

This facility is proposed and has not been reported as operational. Details are based on public filings and announcements as of .

Key facts

Location
Santa Clara, CA, Santa Clara County
Capacity
35 MW planned
Powered by
FlexGrid hybrid: SVP on-grid electricity + natural gas + hydrogen fuel cells
Announced
2026-04
Last updated

Civic impact

Energy & water

Energy source
Mixed · Utility: Silicon Valley Power (SVP)
Cooling
Closed-loop

FlexGrid architecture combines SVP on-grid electricity with natural gas and hydrogen fuel cells behind the meter, bypassing SVP grid interconnection queue constraints. Sub-1.15 PUE target. Rack densities 75-270kW for AI high-density compute.

When hydrogen fuel cells are used, by-product water from hydrogen generation supplies the cooling loop, eliminating freshwater draw — significant for drought-prone California.

Status history

  1. Proposed

    ECL publicly announced CSC-1, a 35MW FlexGrid-powered AI data center in Santa Clara; first phase delivery targeted Q4 2026

    ECL 35MW FlexGrid-Powered Data Center in Santa Clara Builds Atop On-Grid Power for High-Density AI Delivery

Location

Sources & data provenance

Reported: data based on credible news outlets or industry sources.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →