EdgeCore Mesa Data Center Campus

EdgeCore Digital Infrastructure

Under constructionAI-specificConfirmed

Key facts

Location
Mesa, AZ, Maricopa County
Capacity
200 MW
Powered by
Announced
2022-01
Last updated

Civic impact

Economics

Land
84 acres

Energy & water

Energy source
Grid · Utility: Salt River Project (SRP)
Cooling
Air-cooled

Air-cooled closed-loop chilled water system; direct-to-chip liquid cooling available for high-density AI racks

Air-cooled design requires no water recharge; closed-loop chilled water system

Community sentiment

Supported

EdgeCore's Mesa campus (Elliot Road Technology Corridor) has operated since 2023 and expanded without documented project-specific opposition; the CEO framed Greater Phoenix as 'the AI center of the West.' Broader metro-Phoenix water and power scrutiny applies at the sector level.

EdgeCore Announces Metro Phoenix Expansion to 450MW

Status history

  1. Operational

    Initial campus operational; first $150M, 180,000 sq ft building serving hyperscale AI and cloud clients

  2. Under construction

    43.87-acre expansion adds three buildings, raising planned total to 450MW and 3.1M sq ft; PH02 topped out December 2024, expected fully operational 2026

    EdgeCore Announces Metro Phoenix Expansion to 450MW

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →