Mesa, AZ · Maricopa County · 33.375°N 111.650°W
EdgeCore Mesa Data Center Campus
EdgeCore Digital Infrastructure
Key facts
- Location
- Mesa, AZ, Maricopa County
- Capacity
- 200 MW
- Powered by
- —
- Announced
- 2022-01
- Last updated
Civic impact
Economics
- Land
- 84 acres
Energy & water
- Energy source
- Grid · Utility: Salt River Project (SRP)
- Cooling
- Air-cooled
Air-cooled closed-loop chilled water system; direct-to-chip liquid cooling available for high-density AI racks
Air-cooled design requires no water recharge; closed-loop chilled water system
Community sentiment
EdgeCore's Mesa campus (Elliot Road Technology Corridor) has operated since 2023 and expanded without documented project-specific opposition; the CEO framed Greater Phoenix as 'the AI center of the West.' Broader metro-Phoenix water and power scrutiny applies at the sector level.
EdgeCore Announces Metro Phoenix Expansion to 450MWStatus history
- Operational
Initial campus operational; first $150M, 180,000 sq ft building serving hyperscale AI and cloud clients
- Under construction
43.87-acre expansion adds three buildings, raising planned total to 450MW and 3.1M sq ft; PH02 topped out December 2024, expected fully operational 2026
EdgeCore Announces Metro Phoenix Expansion to 450MW
Location
Sources & data provenance
Confirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
- EdgeCore Digital InfrastructureRetrieved:
- Data Center DynamicsRetrieved:
Compute Atlas is community-correctable. If you have better data, please open an issue.