Skip to main content
Compute Atlas
← Back to the map

Marana, AZ · Pima County · 32.495°N 111.198°W

Luckett Road Data Centers (Fremont Peak Properties)

Fremont Peak Properties LLC (Beale Infrastructure)

ProposedLikely AI-specificReported

This facility is proposed and has not been reported as operational. Details are based on public filings and announcements as of .

Key facts

Location
Marana, AZ, Pima County
Capacity
Powered by
Announced
2025-10
Last updated

Civic impact

Economics

Investment
$5B
Land
661 acres

Energy & water

Energy source
Grid · Utility: Trico Electric Cooperative (north parcel); Tucson Electric Power (south parcel)
Cooling
Air-cooled

Trico Electric Cooperative to provide 550-750MW to the north parcel; Tucson Electric Power to provide a 'matching amount' to the south parcel (combined range roughly 1,100-1,500MW; no single confirmed total given, so omitted from capacityMw).

Marana town code prohibits use of potable water for cooling systems; project proposed as air-cooled. Additional water for irrigation/industrial/fire suppression to be provided by the Cortaro Marana Irrigation District.

Community sentiment

Contested

Marana Town Council approved rezoning 6-0 after hours of packed public testimony on water, power, and growth concerns. Opposition group Worker Power organized a referendum petition challenge; Marana officials rejected the referendum on a technicality (petition lacked required legal property descriptions), ending the challenge. Marana resident and cybersecurity expert Jackie McGuire raised concerns specifically about Blue Owl Capital (Beale Infrastructure's parent).

Rezoning approved for Marana data center campus

Status history

  1. Proposed

    Marana Town Council voted 6-0 to rezone 661 acres along Luckett Road for the data center campus (Fremont Peak Properties/Beale Infrastructure), following applications submitted in October 2025 and packed public testimony on water, power, and growth concerns.

    Rezoning approved for Marana data center campus
  2. Proposed

    Opposition group Worker Power submitted referendum petitions challenging the rezoning; Marana officials rejected the referendum on the grounds that petitions lacked required legal property descriptions, ending the challenge.

    Marana rejects referendums against data center rezoning

Location

Sources & data provenance

Reported: data based on credible news outlets or industry sources.

Last updated:

Compute Atlas is meant to be corrected. If you have better data on this facility, please open an issue.

Suggest a correction →