Skip to main content
Compute Atlas
← Back to the map

Childress, TX · Childress County County · 34.428°N 100.205°W

IREN Horizon — Childress, TX

IREN (Iris Energy)

Under constructionAI-specificConfirmed

Key facts

Location
Childress, TX, Childress County County
Capacity
750 MW planned
Powered by
ERCOT
Announced
2025
Last updated

Civic impact

Economics

Land
576 acres

Energy & water

Energy source
Grid · Utility: ERCOT
Cooling
Closed-loop

Direct 345 kV grid connection via on-site substations owned by IREN. IREN states it utilizes abundant low-cost renewable energy available on ERCOT and actively curtails consumption during high-demand periods. No on-site gas generation confirmed for this site.

Direct-to-chip closed-loop liquid cooling. IREN states the system does not consume water on an ongoing basis; annual top-ups require roughly as much water as a few houses. Water is trucked in externally — deliberately not drawn from Childress municipal supply. System described as analogous to a vehicle radiator.

Community sentiment

Supported

Local leadership and community described as strongly supportive. IREN COO stated community partnership was essential to construction progress. Community Grants Program distributes $250,000 annually to Childress area. IREN committed to local hiring and contracting with local businesses where possible.

IREN continues developing data center campus in Childress

Status history

  1. Under construction

    Horizon 1 (75 MW gross / 50 MW IT) announced March 11, 2025; construction underway at existing Childress campus

    IREN plans 75MW liquid-cooled AI data center in Texas
  2. Under construction

    IREN signs $9.7B five-year Microsoft GPU cloud contract November 2025; Horizons 1–4 at Childress targeted for end-2026 full deployment

    IREN Secures $9.7bn AI Cloud Contract with Microsoft
  3. Operational

    Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — IREN's first purpose-built AI data center; Horizons 2–4 remain under construction

    IREN: Horizon 1 Data Center

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →