Gallatin, TN · Sumner County County · 36.388°N 86.437°W
Meta Gallatin Data Center Campus
Meta
Key facts
- Location
- Gallatin, TN, Sumner County County
- Capacity
- 300 MW
- Powered by
- —
- Announced
- 2022
- Last updated
Civic impact
Economics
- Land
- 900 acres
- Jobs
- 1,100 construction
Energy & water
- Energy source
- Mixed · Utility: TVA
- Cooling
- Air-cooled
Third-party solar arrangement with TVA to match approximately 300 MW consumption; multiple PPAs including solar deals through TVA
Direct air cooling (outside air + fan technology), no conventional AC units; "use 80% less water than a typical data center" (w.media). Goal of being water-positive by 2030. No site-specific MGD figure published.
Public subsidies
- Woolhawk LLC (Meta subsidiary) PILOT via the Gallatin Industrial Development Board — 20-year term plus construction; payments from $1M/yr (building 1) declining to $550K/yr (building 6), through an IDB land-leaseback mechanismCity of Gallatin / Sumner County, TN
- Tennessee data-center sales/use-tax exemption (statutory; qualified facilities ≥$100M investment and ≥15 jobs at 150% of state avg wage) — Meta eligible; site-specific value not publicly disclosedState of Tennessee
Community sentiment
Construction peaked at an average of ~1,100 skilled-trade workers on site, and the facility supports "over 100 operational jobs" (a floor) — per the Tennessee Municipal League (Nov 2024). Meta has contributed more than $1M to local nonprofits, the county school system, Volunteer State Community College, and the chamber, plus a $250K grant to the Gallatin Shalom Zone; planted 30 acres of native pollinator habitat and partnered with the Tennessee Environmental Council on school pollinator gardens. LEED Gold; 100% renewable-matched. No public opposition found. Investment "will exceed $1.5 billion once fully built out" (forward-looking; not yet realized).
Meta data center begins operations in GallatinStatus history
- Proposed
Meta announces Gallatin campus expansion
- Operational
Campus officially launched November 2024 with six facilities on 900 acres
- Operational
Gallatin Municipal Planning Commission grants permission for 135,000 sq ft tent-based GPU cluster facility; Meta building multi-billion-dollar GPU clusters in rapid deployment structures to accelerate AI capacity
Meta brings data centers in tents to Gallatin, Tennessee
Location
Sources & data provenance
Confirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
- Data Center DynamicsRetrieved:
- WEKU / NPRRetrieved:
- Tennessee Municipal LeagueRetrieved:
- Pascal for GallatinRetrieved:
- w.mediaRetrieved:
Compute Atlas is community-correctable. If you have better data, please open an issue.