Bowling Green, OH · Wood County · 41.432°N 83.701°W
Meta Bowling Green (Project Accordion)
Meta
Key facts
- Location
- Bowling Green, OH, Wood County
- Capacity
- —
- Powered by
- Grid (100% renewable energy matching; Toledo Edison/FirstEnergy utility) plus 350 MW on-site gas generation (Will-Power Apollo facility, OPSB approved Feb 3, 2026)
- Announced
- 2025-04
- Last updated
Civic impact
Economics
- Investment
- $800M
- Land
- 280 acres
- Jobs
- 1,000 construction · 100 permanent
Energy & water
- Energy source
- Mixed · Utility: Toledo Edison
- On-site generation
- 350 MW
100% renewable energy matching committed for grid-drawn power (Toledo Edison/FirstEnergy). Will-Power OH LLC (subsidiary of The Williams Companies) constructing 350 MW Apollo behind-the-meter gas facility adjacent to data center campus; OPSB approved February 3, 2026 (Case No. 25-973-EL-BGN) via fast-track Letter of Notification process — no public hearing held. Plant includes ~120 MW battery energy storage. Not grid-connected. Wood County holds C ozone rating (American Lung Association).
Public subsidies
- Community Reinvestment Area 75% property tax abatementWood County, OH · 2023
Community sentiment
Ohio Power Siting Board fast-tracked approval (Feb 3, 2026) of 350 MW Will-Power Apollo on-site gas plant with no public hearings; residents and environmental advocates raised air quality concerns in Wood County (C ozone rating). Two residences lie within 1,000 feet of planned generating equipment. Plant projected to emit over 2.4 million tons of CO2 annually.
Ohio Data Center Expansion Faces Opposition Over New 350 MW Gas Plant ApprovalStatus history
- Proposed
Project known locally as Project Accordion via shell company Liames LLC; Fortune 200 company not yet named
- Under construction
Meta publicly announced April 9, 2025 at Bowling Green State University press conference; construction already underway at announcement; target opening 2027
Meta to develop data center campus outside Toledo, Ohio
Location
Sources & data provenance
Confirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
- Data Center DynamicsRetrieved:
- Meta Data CentersRetrieved:
- Construction Owners Association of AmericaRetrieved:
- Ohio Power Siting BoardRetrieved: