Prineville, OR · Crook County · 44.304°N 120.852°W

Meta Prineville Data Center Campus

Meta

OperationalMixed-useConfirmed

Key facts

Location
Prineville, OR, Crook County
Capacity
400 MW
Powered by
grid (PacifiCorp) + wind PPA
Announced
2010
Last updated

Civic impact

Economics

Land
240 acres
Jobs
1,000 construction · 350 permanent

Energy & water

Energy source
Grid · Utility: Pacific Power (PacifiCorp)
Cooling
Hybrid

100% renewable match via PPAs and RECs; Meta contracted 437 MW of new Oregon solar, including about 100 MW in the Prineville area. 2023 average PUE 1.08; no on-site generation.

Outdoor-air economizer cooling with evaporative assist on peak days. Annual withdrawal was ~68.4M gallons (2022), down from a ~117.5M-gallon peak (2020); use concentrates on roughly 10 hot summer days (about 10% of city consumption on those days). Meta co-funded a second aquifer storage-and-recovery injection well.

Public subsidies

Community sentiment

Mixed

Broadly supportive — credited with reversing post-recession unemployment; city franchise fees from data-center power grew from ~$430K (2011) to ~$11M/year (2024). But Crook County schools forgo tens of millions per year in abated taxes, biologists have flagged aquifer-drawdown concerns, and in 2026 Oregon moved to pause data-center enterprise-zone exemptions for new applicants. A June 2026 contractor change cut 66 logistics jobs (Meta said most would be rehired).

Prineville Wants More Out of Its Next Data Center Deal — The Source Weekly

Status history

  1. Operational

    Meta's first company-owned data center; campus expanded with multiple buildings through 2023

    Meta Platforms data centers — Wikipedia

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.