Bristow, VA · Prince William County · 38.728°N 77.560°W

Microsoft Bristow Data Center Campus (MNZ03)

Microsoft

OperationalMixed-useReported

Key facts

Location
Bristow, VA, Prince William County
Capacity
Powered by
Announced
2021
Last updated

Civic impact

Economics

Land
83 acres

Energy & water

Energy source
Grid · Utility: Dominion Energy Virginia

Grid-served by Dominion Energy Virginia (per an interconnection tracker); no on-site generation is reported.

MNZ03 became operational around the 2024–25 transition in Microsoft's cooling standard (from evaporative-assist to closed-loop, zero-water evaporation for new designs), and the specific system installed here is unconfirmed. Microsoft reported reaching corporate 'water-positive' status in FY2025.

Community sentiment

Mixed

MNZ03 was built by-right on the former Atlantic Research rocket-testing site (existing heavy-industrial zoning within the county's data-center overlay), so it required no rezoning and faced no site-specific hearing. But it sits at the epicenter of Prince William County's data-center opposition — supervisors denied a nearby data center 4–2 in Sept 2025, residents sued over an adjacent rezoning, and the county is moving to end the overlay district. Microsoft is eligible for Virginia's data-center sales-and-use tax exemption, but state law bars disclosure of recipients and amounts.

Prince William supervisors deny Bristow Campus data center following protest — InsideNova

Status history

  1. Proposed

    Microsoft acquired 83 acres at 8008 Devlin Road for $83.84M and an adjacent 9.6-acre parcel; multi-phase campus planned, first building (MNZ03) to comprise 250,000 sq ft over three stories

    Microsoft 8008 Devlin Rd Data Center — Datacentermap.com
  2. Operational

    MNZ03 reported as operational per Baxtel third-party tracking database; year built listed as 2025; described as fully operational Azure facility

    Microsoft MNZ03 Data Center — Baxtel

Location

Sources & data provenance

Reported: data based on credible news outlets or industry sources.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →