Pecos, TX · Reeves County · 31.420°N 103.490°W

Microsoft Pecos Data Center Campus

Microsoft

ProposedAI-specificConfirmed

This facility is proposed and has not been reported as operational. Details are based on public filings and announcements as of .

Key facts

Location
Pecos, TX, Reeves County
Capacity
2,000 MW planned
Powered by
Behind-the-meter natural gas plant (Chevron/Energy Forge One, up to 2.67 GW; GE Vernova turbines)
Announced
2026-06
Last updated

Civic impact

Economics

Land
7,000 acres
Jobs
6,000 construction

Energy & water

Energy source
On-site gas · Utility: Chevron/Energy Forge One LLC
On-site generation
2,670 MW
Cooling
Closed-loop

20-year PPA with Energy Forge One (Chevron subsidiary) for dedicated behind-the-meter natural gas plant (~$7B plant cost). GE Vernova and Caterpillar/Solar Turbines. Campus designed to eventually integrate with ERCOT regional grid.

Closed-loop cooling designed to minimize water use, compared by Microsoft to a fast-food restaurant on a lifecycle basis.

Status history

  1. Proposed

    Microsoft announces 2 GW campus in Pecos as one of largest single capacity additions in company history. Five-to-seven-year build-out planned.

    Microsoft announces Pecos data center campus

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →