Vineland, NJ · Cumberland County County · 39.486°N 74.992°W

Nebius Vineland Data Center

Nebius Group

OperationalAI-specificConfirmed

Key facts

Location
Vineland, NJ, Cumberland County County
Capacity
100 MW
Powered by
on-site natural gas (primary, ~85%); Vineland MUA (supplemental, ~15%)
Announced
2025
Last updated

Civic impact

Energy & water

Energy source
On-site gas · Utility: Vineland Municipal Utilities Authority (supplemental, ~15%)
Cooling
Air-cooled

32 high-efficiency natural gas engines generate approximately 85% of facility power; 6 diesel generators for backup. Proposed 1.5-million-gallon LNG storage tank as pipeline contingency (pending approval). NJDEP air permit under review as of early 2026; Sierra Club and Pinelands Alliance objecting to emissions profile. Facility located in Wellhead Protected Area near Kirkwood-Cohansey aquifer.

Developer explicitly states facility will not consume water for equipment cooling (Philadelphia Inquirer, Jan 2026). A four-step exhaust reclamation system on the gas engines (selective catalytic reduction, oxy catalyst, wet scrubbers, biofilters) captures condensate from engine exhaust for recycling — this is emissions control on the power plant side, not IT-equipment cooling. City department figures show 1.1 million gallons/year municipal water draw (Inquirer, Jan 2026); a separate source (WHYY) cites 'up to 20 million gallons annually' — discrepancy unresolved, likely reflecting different accounting (total throughput vs. net municipal draw). Reporting 'reportedMgd' field omitted due to conflicting figures.

Public subsidies

Community sentiment

Mixed

City council and mayor formally support the project; PILOT Ordinance 2026-3 adopted unanimously January 27, 2026. Approximately 100 residents rallied in opposition (noise, emissions, water, property values, health concerns). Pinelands Alliance hosted community town hall. Sierra Club and Sustain South Jersey formally oppose, citing construction without final environmental permits, proximity to Pinelands, and lack of public process. NJDEP reviewing air permit and investigating facility's emissions as a single-source with adjacent parcels.

A Town Hall Too Late – Vineland Data Center

Status history

  1. Proposed

    Nebius and DataOne announce phased AI data center in Vineland, NJ; 20-week first-phase build target, total ceiling 'up to 300 MW'

    Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey
  2. Operational

    First phase completed in approximately 20 weeks (summer 2025); Nebius committed to 100 MW installed capacity by year-end 2025; Microsoft GPU capacity deliveries begin late 2025. Full campus buildout targeting November 2026.

    We're introducing the 300 MW New Jersey region and expanding to Iceland

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.