TX · Pecos County · 30.894°N 102.880°W
Poolside Project Horizon AI Campus
Poolside AI
Data centerProposedAI-specificReported
Key facts
- Location
- TX, Pecos County
- Capacity
- 2,000 MW planned
- Powered by
- —
- Announced
- —
- Last updated
Civic impact
Economics
- Land
- 568 acres
Energy & water
- Energy source
- On-site gas
- On-site generation
- 2,000 MW
Designed in eight 250-MW phases powered primarily by on-site aeroderivative gas turbines fueled by Permian Basin natural gas; site adjacent to a major gas-processing hub.
Status history
No recorded status history yet.
Location
Sources & data provenance
Reported: data based on credible news outlets or industry sources.
Last updated:
- PoolsideRetrieved:
- Data Center DynamicsRetrieved:
- Data Center FrontierRetrieved:
- American Public Power AssociationRetrieved:
- ForbesRetrieved:
Compute Atlas is meant to be corrected. If you have better data on this facility, please open an issue.
Suggest a correction →