Power generationProposedReported

This facility is proposed and has not been reported as operational. Details are based on public filings and announcements as of .

Key facts

Location
VA, Wise County
Capacity
600 MW planned
Powered by
Announced
2025-12
Last updated

Powers

At/adjacent to the Lonesome Pine Regional Business & Technology Park (near Lonesome Pine Regional Airport), Wise County, on former mined land. Governed by a 2025-12-18 Letter of Intent between Red Post Energy Group and Wise Innovation Hub Venture LLC; pre-development stage — fuel (hydrogen vs natural gas) not finalized.

Civic impact

Energy & water

Energy source
Other

Phased dedicated power for the Wise Innovation Hub data-center cluster: begins with a 100 MW plant, scaling up to 600 MW. Red Post's preferred fuel is hydrogen; natural gas is the stated fallback (Plan B).

Community sentiment

Status history

  1. Proposed

    Red Post Energy Group and Wise Innovation Hub Venture executed a Letter of Intent for the phased power plant

    Red Post Energy and Wise Innovation Hub Venture (OASIS) execute LOI to advance power infrastructure

Location

Sources & data provenance

Reported: data based on credible news outlets or industry sources.

Last updated:

Compute Atlas is meant to be corrected. If you have better data on this facility, please open an issue.

Suggest a correction →