Palmetto, GA · Fulton County · 33.548°N 84.724°W

T5 @ Atlanta IV

T5 Data Centers

ProposedLikely AI-specificReported

This facility is proposed and has not been reported as operational. Details are based on public filings and announcements as of .

Key facts

Location
Palmetto, GA, Fulton County
Capacity
300 MW planned
Powered by
Announced
2024-08-28
Last updated

Civic impact

Economics

Land
91 acres

Energy & water

Energy source
Grid
Cooling
Hybrid

On-site electrical substation providing grid power; substation expected operational 2026.

Air and liquid cooling designed for high-density AI workloads.

Community sentiment

Unknown

Status history

  1. Proposed

    Land acquisition finalized; 91-acre site already zoned for data-center use; use permit still required

    T5 Finalizes Land Acquisition in Atlanta to Support a 300 MW Data Center Campus
  2. Proposed

    T5 refiled modified plans: 1.32M sq ft, 3 buildings, up to 300 MW; the original June 2024 filing (495K sq ft, 2 buildings) was withdrawn

    T5 files to develop data center campus outside Atlanta, Georgia

Location

Sources & data provenance

Reported: data based on credible news outlets or industry sources.

Last updated:

Compute Atlas is community-correctable. If you have better data, please open an issue.

Suggest a correction →