Power generationOperationalConfirmed

Key facts

Location
Berwick, PA, Luzerne County
Capacity
2,514 MW
Powered by
Announced
Last updated

Civic impact

Energy & water

Energy source
Nuclear

Existing 2,514 MW two-unit (BWR) plant, operating since the 1980s. Up to 1,920 MW earmarked for AWS via a front-of-meter retail power supply PPA through 2042 (announced 2025-06-11), ramping from 840-1,200 MW by 2029 to 1,680-1,920 MW by 2032. This front-of-meter structure replaced the original co-located behind-the-meter arrangement after FERC rejected that interconnection service agreement 2-1 on 2024-11-01; transition expected after transmission reconfiguration, targeted spring 2026.

Community sentiment

Contested

American Electric Power (AEP) and Exelon formally intervened at FERC against the co-located behind-the-meter ISA amendment, arguing it could shift up to $140 million/year in transmission costs onto PJM ratepayers as a 'free rider' benefit -- a factor in the ISA's rejection. This is a regulatory/ratepayer-cost dispute among utilities, not local community opposition; the front-of-meter restructuring addresses the underlying jurisdictional issue.

AEP, Exelon challenge PJM interconnection pact for Amazon data center at Talen nuclear plant

Status history

  1. Operational

    FERC votes 2-1 to reject the Talen-AWS behind-the-meter interconnection service agreement (ISA) amendment that would have raised co-located load from 300 MW to 480 MW

    Talen Energy Statement on FERC Order Rejecting Susquehanna ISA
  2. Operational

    Talen and AWS announce an expanded 1,920 MW front-of-meter power supply agreement through 2042, restructured to avoid FERC interconnection approval

    Talen to sell Amazon 1.9 GW from Susquehanna nuclear plant

Location

Sources & data provenance

Confirmed: data verified against official filings, permits, or direct operator announcements.

Last updated:

Compute Atlas is meant to be corrected. If you have better data on this facility, please open an issue.

Suggest a correction →