LA · Rapides Parish · 31.390°N 92.669°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Cleco filed testimony with the Louisiana Public Service Commission on July 1, 2026 seeking approval to build a new 756 MW natural gas combustion turbine on its existing Rapides Parish generation campus. Driven in large part by Applied Digital's Delta Forge 1 data center load, but Cleco states the plant will serve all Cleco customers, not solely the data center, and cites retiring older units as an independent driver. Applied Digital is expected to cover the plant's and interconnection's costs.
No recorded status history yet.
Reported: data based on credible news outlets or industry sources.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.