WY · Carbon County · 41.650°N 107.200°W
Simple- and combined-cycle natural gas generation station on the Overland Trail Ranch, combined with wind power. Selective catalytic reduction to cut nitrous oxide emissions by about 90%. Scheduled to come online with the TransWest Express transmission line in 2029 or 2030.
Dry cooling using air rather than water, described as reducing water consumption by up to 95%; about 320 acre-feet per year, sourced from the Platte River.
Preliminary project overview presented to the Carbon County Board of Commissioners.
Proposed Seminoe Power Plant Aims To Cut Water Use 95% And Slash EmissionsReported: data based on credible news outlets or industry sources.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.