McKees Rocks, PA · Allegheny County · 40.465°N 80.081°W
Ardent Data Centers (Northern Data Group)
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
High-density HPC build using rear-door heat exchangers and direct-to-chip liquid cooling; operator target PUE of 1.2 or lower.
Acquisition of the existing Pennsylvania data center completed; conversion to a high-density HPC facility expected complete Q4 2024, scaling to 20 MW.
Ardent Data Centers, a Northern Data Group company, completes acquisition of Pennsylvania data centerReported: data based on credible news outlets or industry sources.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.