North Perry, OH · Lake County · 41.801°N 81.143°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Supplies power to MetaCompany-level / grid-region purchase — no single named campus.
Part of the Jan 2026 Vistra-Meta 20-year PPA package (2,609 MW across three Vistra nuclear plants) — Perry is the single largest allocation (1,268 MW existing + 213 MW uprate). Grid-matched: power continues to the PJM grid rather than a dedicated campus feed, so no poweredFacilityIds. Operated by Vistra since the 2024 Energy Harbor acquisition; NRC license renewed to 2046.
Single-unit ~1,268 MWe net BWR-6 (commercial operation 1987), delivering into the PJM grid. Meta contracts 1,268 MW of existing output plus a 213 MW uprate share under a 20-year PPA.
Vistra and Meta announced a 20-year PPA; Meta contracts the plant's full 1,268 MW existing output plus a 213 MW share of a planned uprate (1,481 MW total), per Vistra's SEC Form 8-K — the largest per-plant allocation in the deal.
Vistra and Meta Announce Agreements to Support Nuclear Plants in PJMConfirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.