Moses Lake, WA · Grant County · 47.130°N 119.278°W
Bitfarms Ltd. (Keel Infrastructure Corp.)
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Bitfarms acquires a 24 MW hydro-powered Bitcoin mining facility in Moses Lake, Grant County, WA, for $26M total ($23M cash + $3M in common shares).
Bitfarms Acquires 24 Megawatts of Hydro Power in the U.S. (6-K Exhibit 99.1, Nov 11, 2021)Bitfarms announces a binding, fully-funded turnkey agreement (~$128-129M, figure dual-sourced across filings) with Vertiv Group to convert the site to HPC/AI workloads (NVIDIA GB300 reference architecture, liquid cooling, target PUE 1.2-1.3), targeting completion December 2026. As of the FY2025 10-K, the site remains an active Bitcoin-mining operation -- conversion not yet complete.
Bitfarms Announces Plans for Conversion of Washington Site to HPC/AI Workloads (6-K Exhibit 99.2, Nov 13, 2025)Confirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.