Happy, TX · Randall County · 35.012°N 101.916°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Wind-powered: substation site within/adjacent to the 163 MW Astra Wind Farm (WindHQ affiliate). $46.9M BlockFi Lending loan financed original construction in 2022 (construction financing, not necessarily total project cost).
Completed deployment and operational by Aug 2022 per The Block; still operational as of the Feb 2026 Canaan acquisition, which describes it as part of an operating JV.
Canaan Inc. Acquires Cipher Mining's Interest in Multiple Operational Mining Projects Totaling ~4.4 EH/s in West TexasConfirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.