NE · Pierce County · 42.200°N 97.550°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Serves both OPPD's general customer base and Google under a joint carbon-free procurement framework. poweredFacilityIds names Papillion because that record already cites this project in its poweredBy field; the framework is utility-wide rather than site-specific.
420 MW solar paired with 170 MW / 4-hour (680 MWh) battery storage. Generation interconnection agreement executed July 2025; online expected 2027.
Generation interconnection agreement executed July 2025; project targeted online in 2027.
OPPD, Google join forces with NextEra on solar and battery project — 420 MW solar + 170 MW four-hour battery on 2,230 acres in Pierce County, online 2027; $316.4M construction impact, 542 construction jobsConfirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.