NE · Sarpy County · 41.056°N 96.191°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Units 1-2 (450 MW combined) online June 2025; Unit 3 (225 MW) targeted end of 2028. No named compute offtaker — this is public-utility system generation, not a dedicated plant.
Dual-fuel simple-cycle combustion turbines: natural gas primary, light fuel oil alternative; stated future compatibility with a 30% hydrogen blend or biodiesel.
Units 1 and 2 (two Siemens Energy dual-fuel combustion turbines, 450 MW combined) entered service June 2025.
Turtle Creek Station — near South 168th Street and Fairview Road in Sarpy County; 450 MW from two Siemens dual-fuel turbines online June 2025; third 225 MW unit targeted end of 2028 for ~675 MW totalA third 225 MW Siemens Energy unit is under construction, targeted for completion by end of 2028, taking the station to about 675 MW.
Turtle Creek Station — near South 168th Street and Fairview Road in Sarpy County; 450 MW from two Siemens dual-fuel turbines online June 2025; third 225 MW unit targeted end of 2028 for ~675 MW totalConfirmed: data verified against official filings, permits, or direct operator announcements.