NE · Dixon County · 42.350°N 96.800°W
Straight-line distances. Nearest named waterway via the USGS National Hydrography Dataset; nearest transmission line via HIFLD. Baseline water stress and groundwater trend describe the surrounding hydrological basin (WRI Aqueduct 4.0, CC BY 4.0) — not this facility’s measured water use. Principal-aquifer system underlying the location (USGS, mapped at 1:2,500,000 — regional context, not site hydrogeology).
Facebook contracted 200 MW of the 320 MW nameplate at announcement and was reported to take the full output over time; Adobe holds a separate 10 MW slice.
Around 1,300 GWh of generation annually; equivalent to over 105,000 US households.
101-turbine, 320 MW wind farm began operations in Dixon County in 2018; Facebook (Meta) contracted for its Sarpy County data center's renewable supply.
Rattlesnake Creek Wind Project — 320 MW, 101 turbines, Dixon County NE, $430 million local investment, ~1,300 GWh/year; powers Facebook's Sarpy Data Center; Adobe purchasing 10 MWConfirmed: data verified against official filings, permits, or direct operator announcements.
Last updated:
Compute Atlas is meant to be corrected. If you have better, source-backed data on this facility, suggest a change — it’s reviewed before anything updates.